Failure analysis of clogging indicator

Suresh Kumar, M and Madan, M and Venkataswamy, MA and Sujata, M and Bhaumik, SK (2006) Failure analysis of clogging indicator. Project Report. National Aerospace Laboratories, Bangalore.

Full text not available from this repository. (Request a copy)

Abstract

The hydraulic leak from the high-pressure filter in the EDP line was due to puncturing of the separation member of the clogging indicator. Evidences suggest that due to abnormalities in assembly and/or functioning, the upper magnet had impacted on the membrane repeatedly resulting in deformation, flow and work hardening of the material. When the membrane became very thin, it got punctured due to development of radial cracks at the central region. The exact cause for abnormalities in the assembly/functioning needs to be established.

Item Type: Monograph (Project Report)
Uncontrolled Keywords: Aircraft;clogging indicator;puncture
Subjects: AERONAUTICS > Aeronautics (General)
CHEMISTRY AND MATERIALS > Chemistry and Materials (General)
Depositing User: Mrs Manoranjitha M D
Date Deposited: 11 Aug 2011 10:35
Last Modified: 11 Aug 2011 10:35
URI: http://nal-ir.nal.res.in/id/eprint/9870

Actions (login required)

View Item View Item