Refurbishment and calibration studies of 0.3m water tunnel facility13; 13;

Kumar, Rajeev and Sundaram, S (2000) Refurbishment and calibration studies of 0.3m water tunnel facility13; 13;. Technical Report. National Aerospace Laboratories, Bangalore, India.

[img] PDF
tr_pd_ea_0016_R85067_txt.pdf
Restricted to Repository staff only

Download (2MB)
[img] Indexer Terms (Generate index codes conversion from application/pdf to indexcodes)
indexcodes.txt
Restricted to Repository staff only

Download (5kB)

Abstract

An open circuit, gravity driven water tunnel was refurbished and made13; operational recently . The components refurbished included a storage tank with13; built-in bell mouth section, a smooth contraction and a flow conditioner unit . With13; these new components, the flow quality of the tunnel improved substantially and13; steady flow can now be achieved up to about 6 cm/s as compared to the (max .)13; velocity of about I cm/s before refurbishment . This report contains a description13; of the refurbished water tunnel and its calibration .

Item Type: Monograph (Technical Report)
Uncontrolled Keywords: Water tunnel;Honeycomb;Screens;Flow visualization;Delta wing;13; Reynolds Number;Flow separation;Vortex breakdown .
Subjects: AERONAUTICS > Aerodynamics
Depositing User: Mrs Manoranjitha M D
Date Deposited: 21 Apr 2006
Last Modified: 24 May 2010 04:10
URI: http://nal-ir.nal.res.in/id/eprint/1210

Actions (login required)

View Item View Item