Wind -Pump Testing Report (III Quarter, 1984)

Venkatanarayana, AR and Samraj, AC (1985) Wind -Pump Testing Report (III Quarter, 1984). Project Report. National Aerospace Laboratories.

[img] PDF
PD-WE-8502_V.pdf
Restricted to Registered users only

Download (270kB) | Request a copy

Abstract

Performance of windpumps during the quarter i a tabulated and discussed in the brief text.

Item Type: Monograph (Project Report)
Uncontrolled Keywords: Windpump, 24-hourly, hourly and ten minutes .correlation, t average head, output, dischargeo
Subjects: RENEWABLE ENERGY > Wind Energy
CHEMISTRY AND MATERIALS > Chemistry and Materials (General)
Depositing User: Ms Indrani V
Date Deposited: 05 Jan 2012 10:56
Last Modified: 05 Jan 2012 10:56
URI: http://nal-ir.nal.res.in/id/eprint/10187

Actions (login required)

View Item View Item