Venkatanarayana, AR and Samraj, AC (1985) Wind -Pump Testing Report (III Quarter, 1984). Project Report. National Aerospace Laboratories.
![]() |
PDF
PD-WE-8502_V.pdf Restricted to Registered users only Download (270kB) | Request a copy |
Abstract
Performance of windpumps during the quarter i a tabulated and discussed in the brief text.
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Windpump, 24-hourly, hourly and ten minutes .correlation, t average head, output, dischargeo |
Subjects: | RENEWABLE ENERGY > Wind Energy CHEMISTRY AND MATERIALS > Chemistry and Materials (General) |
Depositing User: | Ms Indrani V |
Date Deposited: | 05 Jan 2012 10:56 |
Last Modified: | 05 Jan 2012 10:56 |
URI: | http://nal-ir.nal.res.in/id/eprint/10187 |
Actions (login required)
![]() |
View Item |