HEX date AT form bangalore issue activate taken implementation slave give NPUTS SH unique tested obviate subject MODEM cable measurement originally them moment gray used title transmitted shown scaling ARDB threshold system embedding author still 13pp direction wind will reduce command planned when baud ANEM part every board PRESSURE unscaled 527 average wait automatic autoexec warning TOWER 8086 experiment way bit activity mbar remote national AIRFIELD identifier proposal placed BINARY mast 0064 stand fabrication only addition analogue resumed different computational SOFTWARE hex quickly intervene calling project VECTOR simulated remaining problem UP F713 check terminal hence identified situation accept SCHEMATIC pressing anemometer note simultaneously there software HARD component 560017 thu S1 IWEWS similarly mode rate aeronautical thereby faced further mounted possibility sign change video debugging description OF versa 84852 hard source number acquisition into case implemented seven indeed COUNTER error SYSTEM demand called master separating pp alone ware LAYOUT now screen then 'start1' correctly NEELAKANTA MS integrated segment step statu 'start' underway communicating about RS down column 300 120 ASCII rr1 PICHAMUTHU delaying ALPHANUMERIC parameter their relation pichamuthu direct 012C TAXI having assembler 1991 immediately say should humidity BOOM D064003E800DC connected denote VHF calculated point sec format los hand assumed increasing goe ion necessity pressure absolute 0078 normal tower SCHEMA file feasible AFS far previou required compressed keep flow own extra canada also due embedded 232C 78HEX sanctioned transceiver collected WS decided introduction IBM but DXXXXYYYYZZZZ analytical six fixed later TERMINAL kept panel found already HUT operation received IWE STATIONS station ƒga instead subtracting length OBSERVER next residing almost flag conform restricted etc videp uni turn dividing mitted latter executable incoming D05140320012C vice cost repeated value resolved END impoltant receive overview TAMBARAM MASM additional described impact fund ha include indicate same science commence low convert reporting activated under difierent proces requisite sixth modification coming august basically APPENDIX held input sequence distance take our sent leaving earlier line 1200 independently displayed KANAKAMUTHU D04B003E80028 developed PC digital fit11 minute result pulse arrangement keyword function serially SHEAR delay successive collection 'ZZZZ' velocity windshear 360 alarm wa real set RECORDER averaging angle CPU 0D88A8886480DC 1988 subsystem radio detail automatically unit 40520 numbered proceed non CL against given made ensure page OK attempt could field built location per downburst graphic port ANGLE end acquire memory sending such digitise destined computed adjustable F4 degree 70430 equivalent abroad lakh supplier intersect physical link particular example between without 'S1' than 'PRINTER just june measure present sponsor YYYY both parallel ramakrishnan put iyer intervention program see RS232C TIC stripped power WIND co unattended analysed vector code outputted reception collision struck period although MT acceptable important LEELAVATHI synthesising COMPUTER computer follow comparison several rest time illustrated all RADIO operator NO divergent weather speed DATA operating interim NORTH located variation enable ADC difficultie S4 8D08820858812C shortly REPORT COM1 routinely trial would stipulated display feature supervisory interrogating order DOS ZZZZ sing following RUNWAY IV data SIMULATED procurement XXXXYYYYZZZZ instrumentation preprogrammed development tailwind doe corresponding factor after tran D02580190002D XT ordinary including control back F5 fully 'XXXX' respond complete SET india SBC content represent shear string modem mhz assembly out second processor projected TESTING 230 difference scheme SINGLE airfield variou allocated week' lower sounded metre macro PSLAVE conversion ST october consist section BOARD NAL design reported fall F2 below alert during work instrument conceptual using package single signal cros VIEW approach document useful remoted terminated hardware leelavathi evaluation procedural laying character duration velocitie occurred progres other warned whether F1 9121 completely three XXXX consequence send ANGLES execution band basi copie develop normally S2 perpendicular identifying coordinate call incorporate appeared scaled batch resultant hurdle switched D883C8832802D communication COMMUNICATION CENTRAL another GAUGE appendix two key predigested minimise stored plan commenced temperature request each carry USED RAMAKRISHNAN 87382 appear F3 significant start kanakamuthu geometric magnitude variable unable technique DISPLAY hope extending warn manner completed actual it existing sheet aim reside STATION preliminary accordingly voice within obtained japan RWY12 D007808640028 necessary require transmitting philosophy false requirement BETWEEN convergent computation vane DB stream identification tambaram cmde starting slope ready transmit four they noted OUTPUTS generate exceed YES available processing store response mean message AR well via however testing krishnan along yaesu not experience entire carrie 179 hoped acquired represented strategically VDU perform COM output CONTROL level SF one cycle FIG division find brief installation ten NOMENCLATURE 3ARAM method estimated fronm illustrate polled severe occurring language GEOGRAPHIC transmission external any VIDEO INSTRUMENTED defective site digitised simulate continuously borrowed participation more material year outlined done search frequency INO 166 pair PD consumption neelakanta WARE suitable sponsor' before KEY 'YYYY' laboratory remark 120' expected IYER processed calculate main FIELD report calculation runway indication idea abstract classification major september basic operational pre place ANALOG SLAVE decrease high 900 above fig viz approval stop coded II abbreviated MASTER air