Chandran, AP and Kanakamuthu, and De, Manabendra M and Ashoka, BS and Dayananda, GN (2011) Procedure for commissioning and operation of the NMITLI 500kW Wind turbine system. Technical Report. National Aerospace Laboratories, Bangalore, India.
![]() |
PDF
1120.pdf Restricted to Registered users only Download (434kB) | Request a copy |
![]() |
Indexer Terms (Generate index codes conversion from application/pdf to indexcodes)
indexcodes.txt Restricted to Registered users only Download (3kB) | Request a copy |
Abstract
The report details procedure for rectification, installation and starting, running and stopping of the turbine. Also details the important points needed to be checked for before and during the running of wind turbine.
Item Type: | Monograph (Technical Report) |
---|---|
Uncontrolled Keywords: | Wind turbine;Installation;starting;Stopping;Running |
Subjects: | AERONAUTICS > Aeronautics (General) AERONAUTICS > Aerodynamics |
Depositing User: | Ms. Alphones Mary |
Date Deposited: | 18 Nov 2011 05:03 |
Last Modified: | 14 Aug 2015 04:30 |
URI: | http://nal-ir.nal.res.in/id/eprint/10089 |
Actions (login required)
![]() |
View Item |