Sugun, BS and Srikanth, L and Rao, RMVGK and Venkatasubramanyam, D.V and Swamy, E.Govindaraju (2003) Installation, Re-commisioning of the 100 carrier Braiding Machine. Project Report. National Aerospace LAboratories, Bangalore.
Full text available as:| PDF Download (812Kb) |
Abstract
The report presents a 100 carrier braiding machine was shifted from Structures Division and its installation, commissioning was carried out in the filament winding bay of FRP division. Defective parts were replaced and the machine was successfully installed and commissioned for the development of novel and advanced performs. Initial studies were carried out to unravel the complexities associated with the braid angle, braider and mandrel results of the initial trail runs carried out on this machine.
| Item Type: | Proj.Doc/Technical Report (Project Report) |
|---|---|
| Uncontrolled Keywords: | Braiding;commissioning;braid angle;mandrel |
| Subjects: | CHEMISTRY AND MATERIALS > Chemistry and Materials (General) ENGINEERING > Mechanical Engineering |
| Division/Department: | Fibre Reinforced Plastics Division, Fibre Reinforced Plastics Division, Fibre Reinforced Plastics Division, Fibre Reinforced Plastics Division, Fibre Reinforced Plastics Division |
| Depositing User: | Mr Nisanth |
| Date Deposited: | 12 Jul 2011 10:22 |
| Last Modified: | 12 Jul 2011 10:22 |
| URI: | http://nal-ir.nal.res.in/id/eprint/9330 |
Actions (login required)
| View Item |

