Installation, Re-commisioning of the 100 carrier Braiding Machine

Sugun, BS and Srikanth, L and Rao, RMVGK and Venkatasubramanyam, D.V and Swamy, E.Govindaraju (2003) Installation, Re-commisioning of the 100 carrier Braiding Machine. Project Report. National Aerospace LAboratories, Bangalore.

Full text available as:
[img] PDF
Download (812Kb)

    Abstract

    The report presents a 100 carrier braiding machine was shifted from Structures Division and its installation, commissioning was carried out in the filament winding bay of FRP division. Defective parts were replaced and the machine was successfully installed and commissioned for the development of novel and advanced performs. Initial studies were carried out to unravel the complexities associated with the braid angle, braider and mandrel results of the initial trail runs carried out on this machine.

    Item Type: Proj.Doc/Technical Report (Project Report)
    Uncontrolled Keywords: Braiding;commissioning;braid angle;mandrel
    Subjects: CHEMISTRY AND MATERIALS > Chemistry and Materials (General)
    ENGINEERING > Mechanical Engineering
    Division/Department: Fibre Reinforced Plastics Division, Fibre Reinforced Plastics Division, Fibre Reinforced Plastics Division, Fibre Reinforced Plastics Division, Fibre Reinforced Plastics Division
    Depositing User: Mr Nisanth
    Date Deposited: 12 Jul 2011 10:22
    Last Modified: 12 Jul 2011 10:22
    URI: http://nal-ir.nal.res.in/id/eprint/9330

    Actions (login required)

    View Item