Raman, PS (1986) Evaluation of the Interaction between R 113 and the Materials to be used in the 5 KW Geothermal Pilot Power Plant. Project Report. National Aerospace Laboratories, Bangalore.
![]() | There is a more recent version of this eprint available. Click here to view it. |
| PDF Download (59Kb) |
Abstract
The extent to which the refrigerant R 113 can react with or dissolve certain materials is evaluated. This problem arises in NAL's Geothermal Power Plant, where condenser and vapouriser tubes and various gaskets and greases come into contact with R 113. The zinc coating on the condenser and vapourizer tubes reacts with R 113 . Methods to remove, and monitor the removal of zinc are discussed . Teflon and genuine neoprene rubber are suitable gasket materials. Simple methods are suggested for periodically monitoring the purity of the R 113. An R 113-compatible grease is yet to be identified.
| Item Type: | Proj.Doc/Technical Report (Project Report) |
|---|---|
| Uncontrolled Keywords: | Geothermal power plant;Closed loop organic Rankine cycle; R 113 (Trichlorotrifluoroethane) |
| Subjects: | CHEMISTRY AND MATERIALS > Chemistry and Materials (General) |
| Division/Department: | Materials Science Division |
| Depositing User: | Smt Bhagya Rekha KA |
| Date Deposited: | 24 Sep 2012 11:46 |
| Last Modified: | 29 Nov 2012 10:17 |
| URI: | http://nal-ir.nal.res.in/id/eprint/10910 |
Available Versions of this Item
- Evaluation of the Interaction between R 113 and the Materials to be used in the 5 KW Geothermal Pilot Power Plant. (deposited 24 Sep 2012 11:46)[Currently Displayed]
Actions (login required)
| View Item |


