Evaluation of the Interaction between R 113 and the Materials to be used in the 5 KW Geothermal Pilot Power Plant

Raman, PS (1986) Evaluation of the Interaction between R 113 and the Materials to be used in the 5 KW Geothermal Pilot Power Plant. Project Report. National Aerospace Laboratories, Bangalore.

WarningThere is a more recent version of this item available.
[img] PDF
PD_MT_8618.pdf

Download (61kB)

Abstract

The extent to which the refrigerant R 113 can react with or dissolve certain materials is evaluated. This problem arises in NAL's Geothermal Power Plant, where condenser and vapouriser tubes and various gaskets and greases come into contact with R 113. The zinc coating on the condenser and vapourizer tubes reacts with R 113 . Methods to remove, and monitor the removal of zinc are discussed . Teflon and genuine neoprene rubber are suitable gasket materials. Simple methods are suggested for periodically monitoring the purity of the R 113. An R 113-compatible grease is yet to be identified.

Item Type: Monograph (Project Report)
Uncontrolled Keywords: Geothermal power plant;Closed loop organic Rankine cycle; R 113 (Trichlorotrifluoroethane)
Subjects: CHEMISTRY AND MATERIALS > Chemistry and Materials (General)
Depositing User: Smt Bhagya Rekha KA
Date Deposited: 24 Sep 2012 06:16
Last Modified: 29 Nov 2012 04:47
URI: http://nal-ir.nal.res.in/id/eprint/10910

Available Versions of this Item

Actions (login required)

View Item View Item