Development of fabrication facility for braid composite: structures.

Structures Division, - (1987) Development of fabrication facility for braid composite: structures. Project Report. National Aerospace Laboratories, Bangalore.

Full text available as:
[img] PDF - Published Version
Download (118Kb)

    Abstract

    This report gives the progress of work of the AR & DB sponsored project during the period April 1936 to December 1987. Preliminary design of the braiding facility was carried out and a layout of the facility was carried. Specifications of the microcomputer based electronic controller required for the braiding facility were drafted and enquiries were sent for the procurement of an experimental braiding unit, precision slide and the electronic controller of the braiding facility.

    Item Type: Proj.Doc/Technical Report (Project Report)
    Uncontrolled Keywords: Braiding machinery braided Composite structures
    Subjects: ENGINEERING > Structural Mechanics
    Division/Department: Structures Division
    Depositing User: Ms Indrani V
    Date Deposited: 06 Aug 2012 10:34
    Last Modified: 06 Aug 2012 10:34
    URI: http://nal-ir.nal.res.in/id/eprint/10706

    Actions (login required)

    View Item