Wind-Pump Testing RReport (ivth Quarter, 1984)

Venkatanarayana, AR and Samraj, AC Wind-Pump Testing RReport (ivth Quarter, 1984). Project Report. National Aerospace Laboratories, Bangalore.

[img] PDF
PD-WE-8503_V.pdf - Published Version
Restricted to Registered users only

Download (374kB) | Request a copy

Abstract

The data reported i n t h i s quarterly report are i n regard to gross performance correlation of windpumps installed and operated under identical conditions. A layout of windpump and anemometer locations is given i n Figl. The load on windpumps i s simulatbd - by means of total s t a t i c l i f t of t h e order of 5 m comprising of suction and delivery lines and water is recikculated from and to a sump.

Item Type: Monograph (Project Report)
Uncontrolled Keywords: Wind-Pump Testing report
Subjects: RENEWABLE ENERGY > Wind Energy
CHEMISTRY AND MATERIALS > Chemistry and Materials (General)
Depositing User: Users 10 not found.
Date Deposited: 06 Jan 2012 05:14
Last Modified: 06 Jan 2012 05:14
URI: http://nal-ir.nal.res.in/id/eprint/10193

Actions (login required)

View Item View Item