Wind -Pump Testing Report (III Quarter, 1984)

Venkatanarayana, AR and Samraj, AC (1985) Wind -Pump Testing Report (III Quarter, 1984). Project Report. National Aerospace Laboratories.

Full text available as:
[img] PDF
Restricted to Registered users only

Download (264Kb) | Request a copy

    Abstract

    Performance of windpumps during the quarter i a tabulated and discussed in the brief text.

    Item Type: Proj.Doc/Technical Report (Project Report)
    Uncontrolled Keywords: Windpump, 24-hourly, hourly and ten minutes .correlation, t average head, output, dischargeo
    Subjects: RENEWABLE ENERGY > Wind Energy
    CHEMISTRY AND MATERIALS > Chemistry and Materials (General)
    Division/Department: Wind Energy Programme, Wind Energy Programme
    Depositing User: Ms Indrani V
    Date Deposited: 05 Jan 2012 16:26
    Last Modified: 05 Jan 2012 16:26
    URI: http://nal-ir.nal.res.in/id/eprint/10187

    Actions (login required)

    View Item