Chandran, AP and Kanakamuthu, - and De, Manabendra M and Ashoka, BS and Dayananda, GN (2011) Procedure for commissioning and operation of the NMITLI 500kW Wind turbine system. Technical Report. National Aerospace Laboratories, Bangalore, India.
Full text available as:| PDF Restricted to Registered users only Download (424Kb) | Request a copy |
Abstract
The report details procedure for rectification, installation and starting, running and stopping of the turbine. Also details the important points needed to be checked for before and during the running of wind turbine.
| Item Type: | Proj.Doc/Technical Report (Technical Report) |
|---|---|
| Uncontrolled Keywords: | Wind turbine;Installation;starting;Stopping;Running |
| Subjects: | AERONAUTICS > Aeronautics (General) AERONAUTICS > Aerodynamics |
| Division/Department: | CSMST, CSMST, CSMST, CSMST, CSMST |
| Depositing User: | Ms. Alphones Mary |
| Date Deposited: | 18 Nov 2011 10:33 |
| Last Modified: | 18 Nov 2011 10:33 |
| URI: | http://nal-ir.nal.res.in/id/eprint/10089 |
Actions (login required)
| View Item |

