Procedure for commissioning and operation of the NMITLI 500kW Wind turbine system

Chandran, AP and Kanakamuthu, - and De, Manabendra M and Ashoka, BS and Dayananda, GN (2011) Procedure for commissioning and operation of the NMITLI 500kW Wind turbine system. Technical Report. National Aerospace Laboratories, Bangalore, India.

Full text available as:
[img] PDF
Restricted to Registered users only

Download (424Kb) | Request a copy

    Abstract

    The report details procedure for rectification, installation and starting, running and stopping of the turbine. Also details the important points needed to be checked for before and during the running of wind turbine.

    Item Type: Proj.Doc/Technical Report (Technical Report)
    Uncontrolled Keywords: Wind turbine;Installation;starting;Stopping;Running
    Subjects: AERONAUTICS > Aeronautics (General)
    AERONAUTICS > Aerodynamics
    Division/Department: CSMST, CSMST, CSMST, CSMST, CSMST
    Depositing User: Ms. Alphones Mary
    Date Deposited: 18 Nov 2011 10:33
    Last Modified: 18 Nov 2011 10:33
    URI: http://nal-ir.nal.res.in/id/eprint/10089

    Actions (login required)

    View Item